
Quantity Surveying for Infrastructure Development
Project Overview
£3m
Sept 2024
Quantity Surveying
Warwickshire
This infrastructure project stands as a monumental development in Warwickshire, designed to support the new HS2 track. Spanning 700 metres, these two viaducts are engineered to traverse the River Tame and seamlessly integrate with a complex network of existing transport links, including the vital Birmingham-Peterborough line. This strategic location, nestled between Water Orton and Coleshill Parkway Stations, is pivotal in enhancing connectivity and facilitating efficient transportation.
